Date:

25 November, 2023

Client:

Baghdad Precast Factory

Website:

https://www.4th-dim.com

Design, Build, and Operate 301.8KWp on-grid Baghdad Precast Factory;

it’s the first project in Iraq of its type technical wise. microgrid with Grid, PV, and diesel with future BESS.

The Benefits of Project

helped the client to improve his environmental performance by generating more than 400 MWh annually from solar energy. in addition to its environmental impact, it had positive impact on the operational expenditures of the client, since LCOE of solar is lower than LCOE of diesel generators. 